10 Steps to an Easy Solar Power System Installation

Below you will find the basics in a step by stepwith your Solar Installation Contractor.
process to a pain free and cost effective Solar6. Your Solar Installation Contractor will submit
System Installation. From initial research to gettingapplications to your electric utility and begin
your first solar rebate check from your electricpaperwork with all possible Federal, State, and
company the path is laid out here.possibly local tax rebates, grants, etc., to save
1. Determine your historical energy use from youryou the maximum money possible.
past electric bills. Pay attention to the difference7. You will then sign a contract with your electric
between Summer and Winter power usage.utility. This is called a Net Metering Agreement and
2. Determine your roof area available forstates that the power utility will credit your
Photovoltaic Panels. These Solar Panels mountedaccount for the excess power you produce which
on your roof or ground contain the Photovoltaicflows to the power grid. Also an important
(PV) cells which convert sunlight into DC power.consideration is the use of a Meter Monitor. This
South facing surface areas are best but seasonalwill allow you to be given credit for power you
variations in sun exposure allow for a variety ofgenerate at different rates. These rates can be
Solar Panel placements to be used. Also, newPeak and Off Peak Rates. These rates are
technology allows for sun "tracking" ordependent on time of day you produce power,
programmed mechanical moving of the solarday of the week, and month of the year. Peak
panels to maximize sun exposure during the dayRates are often summer afternoon week days. If
and across all seasons of the year.you send power to the grid during peak times,
3. Contact a licensed and aproved Solar Installationyou will get credit at the higher, peak rate. When
Contractor(s) in your area to perform an on-siteyou gain credit and then draw on your credit at
consultation. Your contractors will know all theOff Peak periods your account will be debited at
current solar technologies available and how toOff Peak rates. If all of the electricity being
take advantage of all possible Federal, State, andgenerated by your solar energy system is
possibly local solar tax rebates, grants, etc.immediately being used, your meter will not "spin
4. The Solar Installation Contractor will determinebackwards".
best location for your Photovoltaic Panels and8. Your Solar Installation Contractor will generate
best Inverters to use for the size of the Solardesign drawings and pull all permits needed and,
System. Location of solar panels may vary aswhen you are ready, will install your system. Once
well as type of panels. Inverters (which convertcompletely installed your County or City will
the solar panel current from DC to usable ACinspect the system to insure compliance of your
current) need to be chosen based on best sizesystem and insure you are elligible for the Solar
and type for the system as does the ProductionTax Rebates and / or benefits you have applied
Meter (explained below). The power from thefor.
Solar Panels are sent to an Inverter (or power9. You Utility Company will be Sending you your
converter) which converts the DC electricity fromSolar Rebate Check 6 to 8 Weeks after
the solar modules to AC power, which is theInspection of System.
same type of power being sent from your utility10. Enjoy decades of environmentally friendly and
company to your home or business. 5. Discuss allmaintenance-free electricity solar power while
costs for various solar electric system optionsadding value to your home! Give yourself a good
and installation timing with your Solar Installationpat on the back for saving money AND the
Contractor to finalize all variables. Once all isplanet.
decided upon it is the time to sign the contract