Oil and Gas - Test Systems and Equipment

Oil and Gas Industries and equipment and securedaily while the part being tested is only
testing systems.pressurized one time. This type of continuous
The Oil and Gas industries as well as the Refiningcycles cause fatigue. All parts subjected to test
and Petrochemical plants have been subjected topressures over a long period of time will fatigue.
continuous and strenuous rules and regulationsThe degree of failure depends on the test
from Governments, Customers, Nationalpressures and number of cycles. For this reason
Standards and End Users. This demand for qualitythe stressing process of Autofrettage was
and system performance requires test equipmentdeveloped to prestress the items subjected to
and test systems to meet or exceed thesepressure in such a way as to create hoop stress
requirements. Safety has become paramount inhigh enough to exceed the stresses in the
the development and use of test systems andmaterials used for testing. Finished parts are
equipment. Personnel can no longer be subjectedsubjected to the Autofrettage process for the
to situations that could cause injury or loss of life.same reason. While the parts being tested only
Safety Audits, Protective Barriers, Testsee the test pressure once, in the field it is
Equipment, Test Systems, High Pressure Pumpssubjected to operating pressures on a continuous
and Valves are all subjected to test pressuresbasis.